CONVERSION OF LABORATORY TO OFFICE SPACE
| Project Owner: | Georgia Institute of Technology |
| Location: | Atlanta, Georgia |
| Contract Amount: | $542,380 |
| Start Date: | Jun 1st 2005 |
| Completion Date: | Jan 1st 2006 |
Description:
This project consisted of converting a 7,000-square-foot science laboratory to office space on the campus of Georgia Institute of Technology. This project was completed in seven months which was on time with minimum change orders.
Point of Contact:
John Giarnese
Georgia Institute of Technology
Office of Facilities
955 Fowler St., NW
Room 208
Atlanta, GA 30332-0410
MORNINGSIDE ELEMENTARY – HVAC REPLACEMENT
| Project Owner: | Atlanta Public Schools |
| Location: | Atlanta, Georgia |
| Contract Amount: | $2,390,000 |
| Start Date: | May 1st 2001 |
| Completion Date: | Jan 1st 2002 |
Description:
This project consisted of replacing the entire HVAC system and architectural upgrades throughout the entire school. The initial schedule included the summer months through the end of the year. However, CCI completed the project during the months without having to inconvenience the students and teachers while school was in session.
Point of Contact:
George Harkness
Atlanta Public Schools
401 W. Peachtree Street
Atlanta, 30308
UPGRADE OB-GYN WOMEN SERVICES
| Project Owner: | Grady Hospital |
| Location: | Atlanta, Georgia |
| Contract Amount: | $285,000 |
| Start Date: | Feb 1st 2007 |
| Completion Date: | May 1st 2007 |
Description:
This project consisted of upgrading the OB-GYN Ward of Grady Hospital. The work consisted of flooring, plumbing, millwork, electrical, HVAC, drywall and painting. This work was completed in phases without interrupting this critical ward of the hospital.
Point of Contact:
Michael Lyle
Grady Hospital
80 Jesse Hill
Atlanta, GA 30303
PIEDMONT HALL – INTERIOR UPGRADES
| Project Owner: | Grady Hospital |
| Location: | Atlanta, Georgia |
| Contract Amount: | $325,000 |
| Start Date: | Apr 1st 2006 |
| Completion Date: | Oct 1st 2006 |
Description:
This project consisted of upgrading three floors of an old asbestos and lead laden building. After the asbestos abatement company removed the toxic finishes, CCI replaced the flooring, ceilings and painted the entire interior.
Point of Contact:
Tyrone Williams
Grady Hospital
80 Jesse Hill
Atlanta, GA 30303
INSTALL PEDESTRIAN SIDEWALKS AND RETAINING WALL
| Project Owner: | Center for Disease Control (CDC) |
| Location: | Atlanta, GA |
| Contract Amount: | $146,000 |
| Start Date: | Oct 1st 2007 |
| Completion Date: | Dec 1st 2007 |
Description:
This project consisted of adding sidewalk, steps, handrails and a retaining wall at the Main CDC Campus in Atlanta. In addition Commemorative Brick Pavers were added at the entrance of Building 19.
Point of Contact:
Art Lingler
CDC
2920 Brandywine Road, MS-K71
Atlanta, GA 30341-5539
SIDEWALK REPAIRS, PIPEWORK, AND FIRE SYSTEMS INSTALLATION
| Project Owner: | DEPARTMENT OF VETARANS AFFAIRS |
| Location: | Tampa, FL |
| Contract Amount: | $97,300 |
| Start Date: | Nov 30th 1999 |
| Completion Date: | Nov 1st 2006 |
Description:
This project included the replacement of sidewalks, fire systems control wires, and storm drainage at the James A. Haley Veterans’ Hospital in Tampa.
Point of Contact:
Benjamin Kosses
Department of Veterans Affairs
Contracting Officer
13000 Bruce B. Downs Blvd.
Tampa, FL 33612
LENOX MALL – MACY’S LADIES’ HANDBAG DEPARTMENT UPGRADE
| Project Owner: | Macy’s |
| Location: | Atlanta, Georgia |
| Contract Amount: | $325,100 |
| Start Date: | Sep 1st 2007 |
| Completion Date: | Nov 1st 2007 |
Description:
The interior modifications to the Handbags Department included replacing the suspended ceiling with a drywall ceiling, carpet replacement, HVAC and electrical upgrades. The project was completed in four phases with minimum disruption in store operations.
Point of Contact:
Darryl Buford
Macy’s South
Store Planning and Construction
223 Perimeter Center Parkway
Atlanta, GA 30346
REPAIR ISOLATION ROOM SCI
| Project Owner: | U. S. Department of Agriculture |
| Location: | TAMPA, FL |
| Contract Amount: | $478,760 |
| Start Date: | Oct 1st 2006 |
| Completion Date: | Jun 1st 2007 |
Description:
This project consisted o the installation of four roof-top HEPA filters serving the critical isolation rooms of the James A. Haley VA hospital. Ductwork was replaced in addition to a new Pressure Differential System.
Point of Contact:
Benjamin Kosses
Department of Veterans Affairs
Contracting Officer
13000 Bruce B. Downs Blvd.
Tampa, FL 33612
NEW DISTRICT OFFICE OF BELLSOUTH
| Project Owner: | BellSouth |
| Location: | New Orleans, LA |
| Contract Amount: | $245,000 |
| Start Date: | Jan 1st 2006 |
| Completion Date: | Jul 1st 2006 |
Description:
This project consisted of building a new 3,500-square-foot office on the third floor of the already-existing Central Office Equipment Building in New Orleans, La. The project involved installing typical drywall, electrical, and HVAC additions. However, since the project was adjacent to live telephone switchgear, special precautions were taken so that work could be done safely.
Point of Contact:
Gregory Keller
AT&T
One Canal Place
New Orleans, LA 70130
MULTIPLE INTERIOR RENOVATION PROJECTS
| Project Owner: | U. S. Department of Agriculture |
| Location: | New Orleans, LA |
| Contract Amount: | $225,100 |
| Start Date: | Sep 1st 2005 |
| Completion Date: | Nov 1st 2007 |
Description:
This work consisted of various interior renovation projects at the National Finance Center in New Orleans, LA. Projects ranged from $2,000 - $25,000 over approximately a two-year period. Most projects included drywall, painting, carpet, electrical and HVAC work.
Point of Contact:
Kraig Kittel
U. S. Department of Agriculture
Facility Manager
13800 Chef Menteur Hwy.
New Orleans, LA 70160
GEORGIA NATIONAL GUARD VARIOUS MATOC PROJECTS
| Project Owner: | Army and Air Force National Guard |
| Location: | Georgia |
| Contract Amount: | $400,760 |
| Start Date: | May 1st 2008 |
| Completion Date: | Mar 1st 2009 |
Description:
This Multiple Award Task Order Contract (MATOC) consists of various construction projects for the Georgia National Guard throughout the State.
Point of Contact:
Oliver Gills
USPFO-GA-P&C
PO Box 17882
Atlanta, GA 17882
Tel: 678.569.6206
U.S. ARMY MARINE CORPS RESERVE CENTER
| Project Owner: | U. S. Marine Corps |
| Location: | Marietta, GA |
| Contract Amount: | $1,057,000 |
| Start Date: | Nov 1st 2005 |
| Completion Date: | Aug 1st 2009 |
Description:
As a Prime-Subcontractor under Vanguard Contractors, CCI is responsible for the construction of 2,200 SF building, the renovation of a 3,000 SF building, as well as the re-surfacing of an 8,000 SF metal building.
Point of Contact:
Steve Beckett
Vanguard Contractors
PO Box 2850
Paducah, KY 42002-2850
Tel: 270.442.8620